精品国产三级a∨在线,女性裸体无遮挡无遮掩视频蜜芽,福利姬国产精品一区在线,无遮挡粉嫩小泬久久久久久久

Yiwu shuangfeng Waste Incineration power Co., Ltd. Project

Construction time:2005年 Location:yiwu zhengjiang province
Construction scale of the project is two 65t/h+two 40t/h circulating fluidized bed garbage incinerators and two 12000kw steam bleeding and condensing steam turbine generator units, which is private station project of the enterprise, with daily garbage disposal capacity of 1200t. It was completed in November 2005.

Related news:
Last one:
Next article: