精品国产三级a∨在线,女性裸体无遮挡无遮掩视频蜜芽,福利姬国产精品一区在线,无遮挡粉嫩小泬久久久久久久

Carl Zeiss Dragon project

Construction time:To be decided Location:Waigaoqiao, Shanghai

The plant site of the project is located at Shanghai Waigaoqiao free trade zone. Total land occupation area of the plant is about 21,118m2. Total floor areais 16,398m2. Main buildings include a main production building, two gatehouses, a fire pump room and pool.

Related news:
Last one:
Next article: